KAWALAN PEROSAK : ANAI-ANAI
KAEDAH KAWALAN : SISTEM UMPANAN
LOKASI : SEKSYEN 9 SHAH ALAM, MALAYSIA
KESIMPULAN;
ANAI-ANAI TIDAK MENGIRA LOKASI, TEMPAT, KEADAAN DAN KEMEWAHAN SESEBUAH BANGUNAN. DI MANA ADA TANAH DAN BANGUNAN, PERATUSAN ANAI-ANAI ADA 60-80% BERGANTUNG KEPADA PERSEKITARAN KELEMBAPAN TANAH.
BERIKUT ADALAH PEMERIKSAAN YANG TELAH DILAKUKAN DI SALAH SEBUAH BANGUNAN 2 TINGKAT.
PEST : TERMITES
CONTROL METHODS: BAITING SYSTEM
LOCATION: SECTION 9 SHAH ALAM, MALAYSIA
CONCLUSION;
TERMITES REGARDLESS OF LOCATION, LOCATION, DESCRIPTION AND BUILDING DETACHED luxury. WHERE IS THE LAND AND BUILDINGS, TERMITE PERCENTAGE IS SUBJECT TO THE ENVIRONMENT 60-80% SOIL MOISTURE .
THE FOLLOWING IS A CHECK THAT WAS DONE IN ONE BUILDING 2nd FLOOR.
PLEASE CALL / WHATSAPP / SMS : 016-338 0960
EMAIL : sales.daunservices@gmail.com
WEBSITE : www.dpchs.com.my
No comments:
Post a Comment